This project consisted of the demolition of the very old existing stadium all the way down to the ground. As well as the removal of the existing overhead electrical distribution and demolition of all the existing switchgear that feed the Stadium and a portion of the existing campus classrooms. The project included the installation of new Grand Stand seating with a Press Box, restrooms, and ticket booth and support buildings with installation of a new 15KV Substation and new underground electrical distribution, new public address system, fire alarm systems and lighting as well as re-feeding the existing classrooms. CSI received a NECA Award for Electrical Excellence for this project.

